News

 

Hoarding and Demolition Works for Lady Shaw Building (1/F and 2/F)

Renovation Works at Room 607 on 6/F Yasumoto International Academic Park

Upgrading and Improvement of Air-Conditioning Plant at Mong Man Wai Building

Temporary Traffic Arrangement for Hoarding Works near Art Museum at University Avenue

Construction of New Dangerous Goods Store for Compressed Gases on Campus at CUHK

Renovation Works of Laboratory at Room G87, LG84 to LG87 University Science Centre

Renovation of Laboratory to Ground Floor and Mezzanine Floor at Hong Kong Institute of Biotechnology

Temporary Closure of Pedestrian Pavement and Traffic Road at University Sports Centre

Temporary Closure of Road and Car Parking Spaces for Hoisting Air-Conditioning Equipment / Materials at Mong Man Wai Building

Hoarding and Demolition Works for Redevelopment of Art Museum Annex

Ground Investigation Works at University Residence No. 4

Slope Stability Improvement Works at Station Road and University Avenue (Feature No. 7NE-C/C32 and 7NE-C/C171)

Temporary Closure of Road and Car Parking Spaces for Hoisting Air-Conditioning Equipment / Materials at Mong Man Wai Building

Extension to University Sports Centre and associated external works

Renovation of Laboratory to Room 244 at Hong Kong Institute of Biotechnology

Temporary Road Closure at Nursery Path near William M.W. Mong Engineering Building

Extension on 2/F of Ho Sin-Hang Engineering Building for New Laboratory Space

Ground Investigation Works for 300-Place Student Hostel at Shaw Campus

Renovation at 5/F of Mong Man Wai Building

Topographic, Tree and Utility Surveys for 300-Place Student Hostel at Shaw Campus

Renovation of Laboratory to Room 202 & 202A at Hong Kong Institute of Biotechnology

Site Formation Work for Centralized General Research Lab Complex (Block 2) at Area 39

Temporary Road Closure at Nursery Path near William M.W. Mong Engineering Building

Temporary Closure of Road and Car Parking Spaces for Hoisting Air-Conditioning Equipment / Materials at Mong Man Wai Building

Renovation Work of Inno Hub on LG/F to R/G of Inter-University Hall

Extension for New Laboratory Space on Roof of Mong Man Wai Building

Extension for New Laboratory Space on 1/F of William M.W. Mong Engineering Building

Topographic Survey, Tree Survey and Underground Utilities Detection / Survey for New Dangerous Goods Store for Compressed Gases at CUHK

Slope Stability Improvement Works at the South of University Residence No. 17 (Feature No. 7NE-C/C65)

Temporary Closure of Road and Car Parking Spaces for Hoisting Air-Conditioning Equipment and Materials at Mong Man Wai Building

Ground Investigation Work for 250 Place Student Hostel at United Campus

Temporary Traffic Arrangement for Hoarding Works at New Asia Road and New Asia Circle

Temporary Traffic Arrangement for Hoarding Works at Central Avenue

Upgrading and Improvement of Air-Conditioning Plant at Mong Man Wai Building

Survey for the Proposed Redevelopment of Art Museum Annex

Extension to University Sports Centre and associated external works

Temporary Traffic Arrangement for Hoarding Works at Central Avenue

The Construction of Green Roof and Associated Work at 3/F & 4/F Roofs of Choh-Ming Li Basic Medical Sciences Building

Renovation Works of MakerSpace Phase II and associated Enhancement Works in Learning Garden at LG/F of University Library

Ground Investigation Works for Centralized General Research Lab Complex (Block 2) at Area 39

Renovation Works of Laboratory at Room 258 University Science Centre

Temporary Closure of Part of Traffic Road and Pedestrian Pavement at New Asia Circle

Renovation Works for Language Laboratories at Room 401, 410 & 416 of Lee Shau Kee Building

Renovation Works at 2/F of Elisabeth Luce Moore Library

Renovation Works at Room G01D of Li Dak Sum Yip Yio Chin Building

Construction Works for Student Hostel at New Asia College

Upgrading Works at Central Data Centre 2 at 7/F Wu Ho Man Yuen Building

Renovation Works of Chan Kwan Tung Inter-University Hall

Renovation Works at 9/F to 11/F of William M. W. Mong Engineering Building

Construction Works for Chung Chi Student Development Complex

Renovation Works at 2/F of Run Run Shaw Science Building

Renovation Works at 1LG/F of Choh-Ming Li Basic Medical Sciences Building

Renovation Works at LG1 to LG4 Lee Woo Sing College

Renovation Works of Microfilm Room at G/F of Library Extension Building

Renovation Works of Makerspace in Learning Garden and Associated Enhancement Works at LG/F of University Library

Renovation Works of Laboratory at Room LG90 University Science Centre

Renovation Works of Laboratory at Room LG31 University Science Centre

Renovation Works of SCS Railway Plaza Tsim Sha Tsui

Renovation Works of William M.W. Mong Engineering Building

Renovation Works of Ho Sin-Hang Engineering Building

Temporary Closure of Road and Car Parking Spaces for Hoisting Equipment and Materials to the Roof of Shanghai Fraternity Association Research Services Centre

Supply and Installation of Campus Model at University Entrance of The Chinese University of Hong Kong

Temporary Closure of Road and Car Parking Spaces for Up-Grading of A/C Works at Roof of Shanghai Fraternity Association Research Services Centre

Ground Investigation Works at University Sports Centre

Renovation Works of 1/F Lobby, Li Wai Chun Building

Renovation Works of I-House Block 1 & 2

Temporary Closure of Car Park at Campus Circuit North next to C. W. Chu College

Renovation Works at Room 1206a of 12/F Yasumoto International Academic Park

Foyer Enhancement Works for Choh-Ming Li Basic Medical Sciences Building

Renovation of Laboratory to Room 216, 216A, 220 & 220A at Hong Kong Institute of Biotechnology

Temporary Closure of Road at Campus Circuit North and Area 39 Drive near C. W. Chu College

Renovation of United College Wu Chung Multimedia Library

Feature Wall at G/F Lobby of Run Run Shaw Science Building

Temporary Closure of Road near C. W. Chu College (Area 39 Drive)

Temporary Closure of Road near C. W. Chu College (Area 39 Drive)

Hoarding and Demolition Works for Chung Chi Student Development Complex

Renovation of Laboratory to Room LG121 at Run Run Shaw Science Building

Renovation Works at 3/F John Fulton Centre

Renovation of Laboratory to Room 238, 238A & 240 at Hong Kong Institute of Biotechnology

Renovation of Laboratory to Room 230 & 230A at Hong Kong Institute of Biotechnology

Renovation Works for Laboratory in Room 138 at Lady Shaw Building

Renovation Works at Room G01 of John Fulton Centre

Temporary Closure of Road at Campus Circuit North (Leading to Lo Kwee-Seong Integrated Biomedical Sciences Building)

Renovation Works at 5/F Room 538 & 539 of Sino Building

Renovation Works of G/F, 1/F, 3/F & 4/F at Shanghai Fraternity Association Research Services Centre

Upgrading and Improvement of Air-Conditioning Plant at University Science Centre

Ground Investigation Works at Staff Quarters Block D and G of Chung Chi College

Renovation Works at 6/F of Tin Ka Ping Building

Renovation Works of Lady Shaw Buildlng

Renovation Works of Pi Ch'iu Buildlng

Temporary Closure of Car Parking Spaces for Hoisting Work to Roof of Academic Building No.1

Improvement Works of Disabled Ramp at Swire Hall 1 & 2 of Fung King Hey Building

Temporary Closure of Existing Car Park Area near C. W. Chu College (Campus Circuit North)

Emergency Preventive Works at the South of University Residence No. 17 (Feature No. 7NE-C/C65)

Temporary Closure of Existing Pedestrian Pavement at Campus Circuit North (Near C. W. Chu College)

Temporary Closure of Existing Cyclist Track at Area 39 (Near New Student Hostel Site)

Renovation Works of G/F and 5/F of Hang Seng Hall at United College

Section 3 Underground Drainage Works at 2x338-Place at Student Hostels on Northern Campus (Block A3 & A4)

Temporary Closure of Pedestrian Pavement at Area 39 Drive (leading to Lo Kwee-Seong Integrated Biomedical Sciences Building)

A & A Works for Li Wai Chun Building from LG1/F to 1/F

Temporary Closure of Part of Traffic Road and Pedestrian Pavement at Central Avenue

Notice of Commencement of Construction Works at 2x338-Place at Student Hostels on Northern Campus (Block A3 & A4)

Notice of Site Possession and Carpark Closure for CUHK Medical Centre

Renovation and Alteration Works for Siu-Loong Pao Building

A Revolutionary Study Commons - University Library Extension (Video)

Site Formation and Foundation Works at Student Hostels on Northern Campus (Block A3 & A4)

 

 

 

Privacy Policy | Disclaimer
Copyright 2020 Campus Development Office, The Chinese University of Hong Kong